pond.Control ↗
PRODUCTION LOG / 2026

Making, in the open.

Daily field notes on building a game with AI. Progress, experiments and what still needs work.

Preparation systems

Reviewed previous production methods, recorded failed iterations, and tested a persistent work log. The next rehearsal will test one approved screen from reference to interactive implementation.

Recorded

  • Separated documented methods from tested results.
  • Verified revision history and conflict protection.
  • Kept the rehearsal and future contest content separate.

Still open

  • Screen reference and visual direction remain undecided.
  • Mobile input and full reconstruction still need rehearsal.
Tools in the process

dot

AI assistant for planning, tool execution, review and work logging.

Preparation records and hosted workspace checks; no continuous agent telemetry is available.

UEFN

Game implementation and editor integration.

Existing project audit; no new competition build.

Blender

Local editable 3D asset production.

Background runtime and export capability checked; new asset rehearsal pending.

Conversations

Narrative interaction experiments.

A narrow desktop result loop worked; later structured validation remains unresolved.